01/07 - New kitchen windows installed | 01/07 - Kitchen windows from the outside | 01/07 - Bathroom nook demoed out | 01/09 - The correct pocket door frame | 01/09 - Corrected skylight well framing |
01/28 - More seismic bracing | 01/29 - Insulation in the kitchen | 01/29 - And the living room | 01/29 - They had extra insulation, so they did the coat closet and the bar wall |
created with igal